July 1, 2017 - 7 pm - Alpine Inn
25-30 residents met on July 1, 2017 to discuss renovation of the Community Hall. The Hall will be opened from 10 am - 12 am on Sat. July 8 for anyone who wants to look at it and help make a decision on how to proceed. A meeting will be held on Sat., July 15 to decide on a plan of action. This is the current situation. We have $28,865.00 from Revenue Sharing to work on the hall. If the money is not used by the end of the year, it may need to be returned. Suggestion, past input other pərtnənt information follows. Raising the building and rebuilding basement walls. We have a bid of $12 to 14,000 from Merle Sikes (376-8895) to lift the building. We have a bud of $15,500.00 from Kindseth Construction (745-2580, 745-1278, 841-0434) to replace two walls in the basement. Preparation that must be done before work can proceed includes: Removing some vegetation. Removing entrances on front and back and lean-to on side of building. Other? Estimate to Raise the structure approx. 3’, and hold, for others to excavate the perimeter, repair/replace the foundation. After the foundation has been repaired/replaced, by others, JGC, INC. will lower for permanent placement. Estimate: $12,000.00 - $14,000.00. Two block walls totaling 110 ft long and 8 ft high poured solid. Vertical rebar 16" on center and horizontal rebar 4ft on center. Foot to be 10 inches deep and at least 16 inches wide. Inside of wall to be struck and finished. All rebar used will be 5/8 rebar. Bid Total. $15500.00 Tearing down the building, storing reusable materials, and using them to rebuild. This could include replacing the basement walls or filling in the basement and building a foundation. REVENUE SHARING APPLICATION FORM 2016 COST ANALYSIS (DOES NOT INCLUDE VOLUNTTEER LABOR) Other pettnent information: SUTTON REVENUE SHARING APPLICATION FORM 2014 SUTTON REVENUE SHARING APPLICATION FORM 2013 One plan for basement.
0 Comments
Leave a Reply. |
Archives
March 2018
Categories |